Uncategorized

NEW YORK SUBWAY CONSTRUCTION

ny_city_subwaynyc_subway

On October 27, 1904, New York City’s subway system officially opened, but talks to build an underground rail system began soon after London opened its subway in 1863. It wasn’t until 1894 that a referendum was put on the ballot to generate financial support from the city and create the Rapid Transit Board, which was in charge of planning the route. The Interborough Rapid Transit Company (IRT) was awarded the contract to build the first subway line. The Rapid Transit Board planned one original route, stretching from City Hall to 96th Street, which then split into two more routes from Broadway to 242nd Street and another that ran under the Harlem River into the Bronx. Bids were then solicited and construction began in 1900.chief engineer, William Barclay Parsons developed. The process, in which crews dug a shallow excavation below the street surface and built a concrete and steel subsurface for trains to run through. The method was a painstaking process that required the relocation of thousands of sewer, gas and water mains and reinforcing buildings along the route. However, some of the exhibit photos clearly show how that many of the buildings did not survive and had to be demolished. While the IRT construction was marred by significant property damage, business disruptions and fatal accidents, it did succeed in addressing the city’s basic objective: a cheap, reliable urban transit system. The five cent fare that remained in place until 1947 allowed an explosive growth of home construction throughout Upper Manhattan and the Bronx

http://www.nyc-architecture.com/ARCH/Notes-subway.htm

Leave a Reply